S No |
Title of Consultancy |
Sponsoring Agency |
Principal Investigator |
Amount (Rs.) |
Remark |
|
|
2002 - 2003 |
||||||
|
1 |
Design of Asiganga-I Small Hydro Project, No. WRC-1-001/2002-2003 dt. 1.5.2002 |
General manager UJVN Ltd. Deheradun |
Prof. D.Das |
7,59,000/- |
Work in Progress |
|
|
2 |
Design of Asiganga-II Small Hydro Project, No. WRC-1-002/2002-2003 dt. 1.5.2002 |
General manager UJVN Ltd. Deheradun |
Prof. D.Das |
6,19,500/- |
Work in Progress |
|
|
3 |
Design of intake and desilting system for Bindu CHU Stream, No. WRC-1005/2002-2003 dt. 11.1.2002 |
Chief Engineer (Hydel) WESEB, Siliguri |
Prof. D.Das |
15,75,000/- |
Work in Progress |
|
|
4 |
Minimum Flow Requirement of River System for Ecology, No WRC-1004/2002-2003 |
WAPCOS |
Dr. G.C. Mishra |
4,20,000/- |
Work in Progress |
|
|
5 |
Augmentation of Course Water Conservation & Recharge Preparation of DRPs for Dehradun & Almora Cities, No. WRC-1008/2002-2003 |
UP Jal Nigam, Dehradun |
Dr. Deepak Khare |
15,00,000/- |
Completed |
|
|
2003 - 2004 |
||||||
|
1. |
Design of Khari Aquduction on No. WRC-1001/2003-2004 dt. 21.6.2003 |
UP Project Corporation Ltd., |
Prof. Ram Pal Singh |
3,24,000/- |
Work in progress |
|
|
2. |
Design of Ring Bund at No. WRC-1002/2003-2004 dt. 27.7.2003 |
|
Prof. Ram Pal Singh |
43,200/- |
Closed |
|
|
3. |
Design at Spillway for Ramman HE Project No. WRC-1003/2003-2004 dt. 1.9.2003 |
S.E. Ramman HE Project WBSEB |
Prof. D. Das |
7,56,000/- |
Work in progress |
|
|
4. |
Study of Minimum Discharge on Sukili for Arranging Sediment Dredged from Balancing Reservoir at BSL Project No. WRC-1004/2003-2004 dt. 1.9.2003 |
Chief Engineer BSL Sundernagar Himachal Pradesh |
Prof. Gopal Chauhan |
1,00,000/- |
Work in progress |
|
|
5. |
Preparation at PFR’s of Hydro Electric Project in Uttranchal No. WRC-1005/2003-2004 dt. 17.9.2003 |
UJVN Ltd. Dehradun |
Prof. D. Das |
60,48,000/- |
Closed |
|
|
6. |
Design at Lakhari Dam & Spillway No. WRC-1006/2003-2004 dt. 17.10.2003 |
UP Project Corporation Ltd. Lalitpur |
Prof. R.P. Singh |
8,64,000/- |
Closed |
|
|
7. |
Renovation of Suringad SHP No. WRC-1007/2003-2004 dt. 29.10.2003 |
Uttranchal JVN Ltd. Pithoragarh |
Prof. D. Das |
32,400/- |
Closed |
|
|
8. |
Consultancy Services Setting up Gurdittiwala SHP Punjab No. WRC-1008/2003-2004 dt. 29.10.2003 |
M/S Utility Power Tech. Ltd., BSES, Noida |
Prof. D. Das |
8,95,860/- |
Closed |
|
|
9. |
Rainwater Harvesting in Chambal Fertilizer Chemicals No. WRC-1009/2003-2004 dt. 25.11.2003 |
Chambal Fertilizer Chemical Ltd., |
Dr. D. Khare |
1,62,000/- |
Closed |
|
|
10. |
River Training Works for Chor Nallah at SASE Manali No. WRC-1010/2003-2004 dt. 21.1.2004 |
AGE, MESR&D, Manali, Distt. Kullu |
Prof. Nayan Sharma |
86,400/- |
Closed |
|
|
11. |
Hydraulic Model Study for UHL-Stage III No. WRC-2001/2003-2004 dt. 16.11.2003 |
Director, P & D Civil, HPSEB Sunder Nagar |
Prof. Nayan Sharma |
8,47,800/- |
Closed |
|
|
12. |
Testing of Soil and Water Samples No. WRC-2002/2003-2004 dt. 22.12.2003 |
STEP, IIT Roorkee |
Prof. S.K. Tripathi |
48,060/- |
Closed |
|
|
13. |
Flood Protection Works along No. WRC-1011/2003-2004 dt. 22.1.2004 |
AGE MES Manali, Kullu |
Prof. Nayan Sharma |
3,45,600/- |
Closed |
|
|
14. |
DPR for Sanegad SHP No. WRC-1012/2003-2004 dt. 1.3.2004 |
G.M. (SHP) Uttranchal Jal Vidyut Nigam Ltd., Dehradun |
Prof. D. Das |
3,78,000/- |
Work in progress |
|
|
15. |
Reconnaisance Survey of Limchigard/Savarigad / Helgu SHP No. WRC-1013/2003-2004 dt. 1.3.2004 |
G.M. (SHP) Uttranchal Jal Vidyut Nigam Ltd., Dehradun |
Prof. D. Das |
81,000/- |
Closed |
|
|
16. |
Checking of Design and Drawing of Electromechanical Equipment of Asi ganga - II-SHP No. WRC-1014/2003-2004 dt. 17.3.2004 |
G.M. (SHP) Uttranchal Jal Vidyut Nigam Ltd., Dehradun |
Prof. D. Das |
1,48,770/- |
Work in progress |
|
|
17. |
Checking of Design and Drawing of Electromechanical Equipment of Asi ganga - I-SHP No. WRC-1015/2003-2004 dt. 18.3.2004 |
G.M. (SHP) Uttranchal Jal Vidyut Nigam Ltd., Dehradun |
Prof. D. Das |
1,64,160/- |
Work in progress |
|
|
2004 - 2005 |
||||||
|
1. |
Preparation of PER for Gauri-Chhina SHP No. WRC-1001/2004-2005 dt. 19.4.2004 |
UJVN Ltd., Dhhradun |
Prof. D. Das |
1,89,000/- |
Closed |
|
|
2. |
Design and Drawing for Protection Work Down Stream at Baba Power House, WRC-1002/2004-2005 dt. 27.4.2004 |
UPJVN Ltd., |
Prof. U.C. Chaube |
64,800/- |
Closed |
|
|
3. |
Preparation of DPR for Helgu SHP No. WRC-1003/2004-2005 dt. 7.5.2004 |
E.E. Pala Maniri HE, UJVN Manali |
Prof. D. Das |
4,10,400/- |
Closed |
|
|
4. |
Preparation of DPR for Savarigad SHP No. WRC-1004/2004-2005 dt. 7.5.2004 |
E.E. Pala Maniri HE, UJVN Manali |
Prof. D. Das |
4,10,400/- |
Closed |
|
|
5. |
Preparation of DPR for Limchigad, SHP No. WRC-1005/2004-2005 dt. 7.5.2004 |
E.E. Pala Maniri HE, UJVN Manali |
Prof. D. Das |
4,10,400/- |
Closed |
|
|
6. |
Feasibility Study for Extension of Runway at No. WRC-1006/2004-2005 dt. 11.5.2004 |
Asstt. General Manager Engg. (c) Airport Authority of |
Prof. Nayan Sharma |
9,75,240/- |
Work in progress |
|
|
7. |
Site Visit of Small Hydro Scheme Near Dharchula Pithoragarh, No. WRC-1007/2004-2005 dt. 13.5.2004 |
E.E. UJVN Dehradun |
Prof. Nayan Sharma |
8,000/- |
Closed |
|
|
8. |
Design of Bridges over No. WRC-1008/2004-2005 dt. 19.5.2004 |
Project Manager, UP Project Corporation Ltd., |
Prof. Ram Pal Singh |
1,62,000/- |
Work in progress |
|
|
9. |
Design of Palwal & Lilwari Ghat VRBs No. WRC-1009/2004-2005 |
Project Manager UP Project Corp. Ltd., Okhla |
Prof. Ram Pal Singh |
1,50,000/- |
Work in progress |
|
|
10. |
PFR for Dunao SHP in Distt. Pauri No. WRC-1010/2004-2005 dt. 18.6.2004 |
GM UJVN Ltd., Dehradun |
Prof. D. Das |
1,89,000/- |
Closed |
|
|
11. |
DPR for Asiganaga III SHP No. WRC-1011/204-2005 dt. 18.6.2004 |
GM UJVN Ltd., Dehradun |
Prof. D. Das |
3,78,000/- |
Work in progress |
|
|
12. |
DPR for Kaligad SHP in Distt. Uttarkashi No. WRC-1012/2004-2005 dt. 18.6.2004 |
GM UJVN Ltd., Dehradun |
Prof. D. Das |
3,78,000/- |
Closed |
|
|
13. |
DPR for Bhilangana – II SHP in Distt. Uttarkashi No. WRC-1013/2004-2005 dt. 18.6.2004 |
GM UJVN Ltd., Dehradun |
Prof. D. Das |
3,78,000/- |
Closed |
|
|
14. |
Design of Bela and No. WRC-1015/2004-2005 dt. 7.11.2004 |
Project Manager, UP Project Corporation Ltd., |
Prof. Ram Pal Singh |
1,65,300/- |
Work in progress |
|
|
15. |
Review of DPR for Proposed 15 MW Vanala HEP No. WRC-1016/2004-2005 dt. 24.11.2004 |
M/S Him Urja Pvt. Ltd., |
Prof. D. Das |
93,670/- |
Closed |
|
|
16. |
Feasibility studies for laying pipe line along Alsaid Khand for Disposal of Silt Study BSL Project No. WRC-1017/2004-2005 dt. 25.11.2004 |
CPCB, |
Prof. Gopal Chauhan |
55,000/- |
Work in progress |
|
|
17. |
Preparation DPR for Kaliganga – I SHP No. WRC-1018/2004-2005 dt. 29.11.2004 |
GM UJVN Ltd., Dehradun |
Prof. D. Das |
3,78,000/- |
Closed |
|
|
18. |
Preparation DPR for Kaliganga – II SHP No. WRC-1019/2004-2005 dt. 29.11.2004 |
GM UJVN Ltd., Dehradun |
Prof. D. Das |
3,78,000/- |
Closed |
|
|
19. |
Preparation DPR for Madhyamaheshwar SHP No. WRC-1020/2004-2005 dt. 29.11.2004 |
GM UJVN Ltd., Dehradun |
Prof. D. Das |
3,78,000/- |
Closed |
|
|
20 |
Preparation of DPR for Tankul SHP No. WRC-1021/2004-2005 dt. 29.11.2004 |
GM UJVN Ltd. Dehradun |
Prof. D. Das |
3,78,000/- |
Work in progress |
|
|
21. |
Preparation of DPR for Painagad SHP No. WRC-1022/2004-2005 dt. 29.11.2004 |
GM UJVN Ltd. Dehradun |
Prof. D. Das |
3,78,000/- |
Work in progress |
|
|
22. |
Site Visit to Okhla Barrage for Bearing WRC-1023/2004-2005 dt. 1.12.2004 |
UP Irrigation Okhla |
Prof. Gopal Chauhan |
10,000/- |
Work in progress |
|
|
23. |
Design of No. WRC-1024/2004-2005 dt. 13.12.2004 |
Project Manager, UP Irrigation Corporation Ltd., Roorkee |
Prof. Ram Pal Singh |
66,120/- |
Closed |
|
|
24 |
Preparation of DPR for Urgam-II SHP No. WRC-1025/2004-2005 dt. 17.12.2004 |
GM UJVN Ltd., Dehradun |
Prof. D. Das |
3,50,000/- |
Work in progress |
|
|
25. |
Study on Sustainable Development of Flora Faina Ecology and Needs at Local Community due to Diversion at No. WRC-1026/2004-2005 dt. 25.1.2005 |
Satluj Jal Vidyut Nigam Ltd. Khakri Shimla |
Prof. U.C. Chaube |
7,16,300/- |
Work in progress |
|
|
26. |
Physical Model Testing of Desilting Arrrangement for Jaldhaka Hydel Project No. 2001/2004-2005 dt. 23.4.2004 |
Chief Engineer, Hydel WBSEB, Silguri |
Prof. D. Das |
14,99,040/- |
Closed |
|
|
2005 - 2006 |
||||||
|
1. |
Restoration of Jalmahul Monumut in the No. WRC-1001/2005-2006 dt. 19.4.2005 |
Jal Mahal Resorts Pvt. Mumbai |
Prof. U.C. Chaube |
1,26,000/- |
Closed |
|
|
2. |
Numerical Modelling & Field Data Collection for No. WRC-1002/2005-2006 dt. 8.8.2005 |
Tahal Consulting Engineers, Gomti Nagar, |
Prof. Nayan Sharma |
9,58,740/- |
Closed |
|
|
3. |
Physical Modelling & Lab Testing for Haidergarh Branch No. WRC-2001/2005-2006 dt. 8.8.2005 |
Tahal Consulting Engineers, Gomti Nagar, |
Prof. Nayan Sharma |
17,57,800/- |
Work in Progress |
|
|
4. |
Preparation of Tender Specification for SHP No. WRC-1003/2005-2006 dt. 2.9.2005 |
D.G.M. Pala Manori Project UJVNH Manasi, Uttarkashi |
Prof. D. Das |
55,100/- |
Closed |
|
|
5. |
Preparation of DPR for Dunao SHP No. WRC-1005/2005-2006 dt. 12.9.2005 |
GM (SHP), UJV Ltd. |
Prof. D. Das |
3,85,700/- |
Work in Progress |
|
|
6. |
Techno Economic Appraisal at Patikari (16 MW) HEP No. WRC-1006/2005-2006 dt. 9.10.2005 |
M/S Patikar Power n Private Ltd. Jorbagh, |
Prof. D. Das |
1,65,300/- |
Work in progress |
|
|
7. |
Evaluation Study of Rural Infrastructure (Irrigation) Project in Sagar Distt. of MP WRC-1007/2005-2006 dt. 14.11.2005 |
NABARD Mumbai |
Prof. U.C. Chaube |
4,68,350/- |
Work in Progress |
|
|
8. |
Planninjg & Design of Rainwater Harvesting System at ITC No. WRC-1008/2005-2006 dt. 21.11.2005 |
ITC |
Dr. Deepak Khare |
1,40,000/- |
Closed |
|
|
9. |
Geological Investigations & Topographical Survey for Alingment of Tunnel for Asiganga I & II SHPS No. WRC-1009/2005-2006 dt. 24.11.2005 |
Uttranchal JVH Maneri Uttarkashi |
Prof. D. Das |
1,65,300/- |
Work in Progress |
|
|
10. |
Structural Design of Bunds in Sector 24 at Panchkula No. WRC-1010/2005-2006 |
EEHUDA Panchkula |
Prof. Ram Pal Singh |
1,32,240/- |
Work in Progress |
|
|
11. |
Structural Design of Bunds along River Ghaggar in Sector22, Panchkula No. WRC-1011/2005-2006 dt. 7.12.2005 |
EEHUDA Panchkula |
Prof. Ram Pal Singh |
88,160/- |
Work in Progress |
|
|
12. |
Construction of Design of Flarible Joint for Dharasu Power House of Manari Bhali Stage II HEP No. WRC-1012/2005-2006 dt. 6.1.2006 |
Ex. Eng., Maneri Bhali Stage Const. Div., Chinyali Sotle, Uttarkashi |
Prof. Gopal Chauhan |
50,000/- |
Work in Progress |
|
|
2006 - 2007 |
||||||
|
1 |
Planning & Design of Rain water harvesting for |
Jalandhar Municipal corp. Jalandhar |
Dr. Deepak Khare |
3,30,600/- |
Closed |
|
|
2 |
Techno Economic Appraisal of 100 MW Malana II HEP, No. WRC-1002/2006-2007 dt. 20.4.2006 |
Everest Power Pvt Ltd. Gurgaon |
Prof. D.Das |
1,10,200/- |
Closed |
|
|
3 |
Hydrology study of Saran Ultra Mega Power Project, No. WRC-1003/2006-2007 dt. 5.5.2006 |
Desein Pvt Ltd. Desein House Greater Kailash-II New |
Prof. U.C. Chaube |
7,81,190/- |
Work in Progress |
|
|
4. |
No. WRC-1004/2006-2007 |
Airport Authority of |
Prof. Nayan Sharma |
8,13,122/- |
Work in Progress |
|
|
5 |
Reclamation of water logged Agricultural land through surface drainage system in development blocks, Khanpur Laksar, Bahadarabad, No. WRC-1005/2006-2007 dt. 2.9.2006 |
Assistant Director Watershed Management, Roorkee at Landhora |
Dr. S.K. Mishra |
17,119/- |
Closed |
|
|
6 |
Design of Cross regulator gates at km 79.372 of No. WRC-1006/2006-2007 dt. 5.9.2006 |
STEP |
Prof. Gopal Chauhan |
25,000/- |
Work in Progress |
|
|
7 |
Ex Post evaluation on ODA Laon project WYC canal HEPs & Uniam HEP, No.WRC-1007/2006-2007 dt. 12.9.2006 |
Ernst & Young Shin |
Prof. D. Das |
1,50,000/- |
Closed |
|
|
8 |
Hydraulic Analysis & Construction Planning of Lodhoma Tunnel No. WRC-1008/2006-2007 dt. 12.10.2006 |
Chief Engineer Hydel Sevoke Road WESEB Siliguri ( West Bangal) |
Prof. Nayan Sharma |
5,38,752/- |
Work in Progress |
|
|
9 |
Physical model studies of Lodhoma- Rammam Interconnection Tunnel, No. WRC- 2001/2006-2007 dt. 12.10.2006 |
Chief Engineer Hydel Sevoke Road WESEB Siliguri ( West Bangal) |
Prof. Nayan Sharma |
14,59.120/- |
Work in Progress |
|
|
10 |
Technical Due Diligence of 99 MW Chuzachen HEP NO. WRC-1009/2006-2007 dt. 27.10.2006 |
KSK Energy Ventures Pvt. Ltd. |
Prof. D.Das |
1,12.240/- |
Closed |
|
|
11 |
Hydrological Studies for |
NIH,Roorkee |
Dr. S.K. Mishra |
44,896/- |
Work in Progress |
|
|
12 |
Hydrologyl and drainage study of Jharkhand Ultra Mega Power Project, No. WRC-1011/2006-2007 dt. 19.12.2006 |
M/S/ Desein Pvt. Ltd. Desein House, G.K. II |
Prof. U.C. Chaube |
14,59,120/- |
Work in Progress |
|
|
13 |
Design & Engineering for DUNAO SHP No. WRC-1012/2006-2007 dt. 26.2.2007 |
Uttaranchal Jal Vidyut Nigam Ltd.,Deheradun |
Prof. D.Das |
11,12,400/- |
Work in Progress |
|
|
2007 - 2008 |
||||||
|
1 |
Progress review of Pati Kari (16 MW) hydroelectric Project No. WRC-1001/2007-2008 dt. 11.6.2007 |
Pati Kari Power Pvt. Ltd. |
Prof. D.Das |
1,34,832/- |
Work in Progress |
|
|
2 |
DPR for SHP at Borolia Irrigation Barrage No. WRC-1003/2007-2008 dt. 3.7.2007 |
Bodoland Infrastructure Development company Pvt. Ltd. |
Prof. D.Das |
4,49,440/- |
Work in Progress |
|
|
3 |
Physical model studies of barrage for sawra kuddu HE Project No. WRC-2001/2007-2008 dt. 13.7.2007 |
Pabbar Valley Power Corp. ltd. Shimla |
Prof. Nayan. Sharma |
40,16,870/- |
Work in Progress |
|
|
4 |
Hydraulic Analysis of Tai Race Tunnel of Baglihar hydroelectric Project, No. WRC 1004/2007-2008 dt. 22.8.2007 |
Jaiprakash Associate Ltd. |
Prof. Nayan Sharma |
2,24,720/- |
Work in Progress |
|
|
5 |
Area Drainage and hydrological study of Talwandi sabo Thermal Power project ,No. WRC-1005/2007-2008 dt. 29.8.2007 |
M/S Desein Pvt. Ltd, Desein House G.K. II |
Prof. U.C. Chaube |
10,11,240/- |
Work in Progress |
|
|
6 |
River Training of |
Inland waterways Authority of India, Noida |
Prof. Nayan Sharma |
25,49,448/- |
Work in Progress |
|
|
7 |
River Training of |
Inland waterways Authority of India, Noida |
Prof.Nayan Sharma |
25,49,448/- |
Work in Progress |
|
|
8 |
River Training of |
Inland waterways Authority of India, Noida |
Prof. Nayan Sharma |
25,49,448/- |
Work in Progress |
|
|
9 |
River Training of |
Inland waterways Authority of India, Noida |
Prof. Nayan .Sharma |
25,49,448/- |
Work in Progress |
|
|
10 |
River Training of |
Inland waterways Authority of India, Noida |
Prof. Nayan Sharma |
25,49,448/- |
Work in Progress |
|
|
11 |
River Training of |
Inland waterways Authority of India, Noida |
Prof. Nayan Sharma |
25,49,448/- |
Work in Progress |
|
|
12 |
Preparation of DPR for Drinking cum Power Generation project for |
Uttranchal InfracstuctureProject Cop.Pvt. Ltd. Deheradun |
Prof. D.Das |
22,47.200/- |
Work in Progress |
|