S No

Title of Consultancy

Sponsoring Agency

Principal Investigator

Amount (Rs.)

Remark

 

2002 - 2003

1

Design of Asiganga-I Small Hydro Project, No. WRC-1-001/2002-2003 dt. 1.5.2002

General manager UJVN Ltd. Deheradun

Prof. D.Das

7,59,000/-

Work in Progress

2

Design of Asiganga-II Small Hydro Project, No. WRC-1-002/2002-2003 dt. 1.5.2002

General manager UJVN Ltd. Deheradun

Prof. D.Das

6,19,500/-

Work in Progress

3

Design of intake and desilting system for Bindu CHU Stream,

No. WRC-1005/2002-2003 dt. 11.1.2002

Chief Engineer (Hydel) WESEB, Siliguri

Prof. D.Das

15,75,000/-

Work in Progress

4

Minimum Flow Requirement of River System for Ecology,

No WRC-1004/2002-2003

WAPCOS

Dr. G.C. Mishra

4,20,000/-

Work in Progress

5

Augmentation of Course Water Conservation & Recharge Preparation of DRPs  for Dehradun & Almora Cities,

No. WRC-1008/2002-2003

UP Jal Nigam, Dehradun

Dr. Deepak Khare

15,00,000/-

Completed

2003 - 2004

1.

Design of Khari Aquduction on Agra Canal System

No. WRC-1001/2003-2004 dt. 21.6.2003

UP Project Corporation Ltd., New Delhi

Prof. Ram Pal Singh

3,24,000/-

Work in progress

2.

Design of Ring Bund at Allahabad

No. WRC-1002/2003-2004 dt. 27.7.2003

S.E. Irrigation Works Circle, Allahabad

Prof. Ram Pal Singh

43,200/-

Closed

3.

Design at Spillway for Ramman HE Project

No. WRC-1003/2003-2004 dt. 1.9.2003

S.E. Ramman HE Project WBSEB

Prof. D. Das

7,56,000/-

Work in progress

4.

Study of Minimum Discharge on Sukili  for Arranging Sediment Dredged from Balancing Reservoir at BSL Project

No. WRC-1004/2003-2004 dt. 1.9.2003

Chief Engineer BSL Sundernagar Himachal Pradesh

Prof. Gopal Chauhan

1,00,000/-

Work in progress

5.

Preparation at PFR’s of Hydro Electric Project in Uttranchal

No. WRC-1005/2003-2004 dt. 17.9.2003

UJVN Ltd. Dehradun

Prof. D. Das

60,48,000/-

Closed

6.

Design at Lakhari Dam & Spillway

No. WRC-1006/2003-2004 dt. 17.10.2003

UP Project Corporation Ltd. Lalitpur

Prof. R.P. Singh

8,64,000/-

Closed

7.

Renovation of Suringad SHP

No. WRC-1007/2003-2004 dt. 29.10.2003

Uttranchal JVN Ltd. Pithoragarh

Prof. D. Das

32,400/-

Closed

8.

Consultancy Services Setting up Gurdittiwala SHP Punjab

No. WRC-1008/2003-2004 dt. 29.10.2003

M/S Utility Power Tech. Ltd., BSES, Noida

Prof. D. Das

8,95,860/-

Closed

9.

Rainwater Harvesting in Chambal Fertilizer Chemicals

No. WRC-1009/2003-2004 dt. 25.11.2003

Chambal Fertilizer Chemical Ltd., Kota

Dr. D. Khare

1,62,000/-

Closed

10.

River Training Works for Chor Nallah at SASE Manali

No. WRC-1010/2003-2004 dt. 21.1.2004

AGE, MESR&D, Manali, Distt. Kullu

Prof. Nayan Sharma

86,400/-

Closed

11.

Hydraulic Model Study for UHL-Stage III

No. WRC-2001/2003-2004 dt. 16.11.2003

Director, P & D Civil, HPSEB Sunder Nagar

Prof. Nayan Sharma

8,47,800/-

Closed

12.

Testing of Soil and Water Samples

No. WRC-2002/2003-2004 dt. 22.12.2003

STEP, IIT Roorkee

Prof. S.K. Tripathi

48,060/-

Closed

13.

Flood Protection Works along Beas River at SASE Manali

No. WRC-1011/2003-2004 dt. 22.1.2004

AGE MES Manali, Kullu

Prof. Nayan Sharma

3,45,600/-

Closed

14.

DPR for Sanegad  SHP

No. WRC-1012/2003-2004 dt. 1.3.2004

G.M. (SHP) Uttranchal Jal Vidyut Nigam Ltd., Dehradun

Prof. D. Das

3,78,000/-

Work in progress

15.

Reconnaisance Survey of Limchigard/Savarigad / Helgu SHP

No. WRC-1013/2003-2004 dt. 1.3.2004

G.M. (SHP) Uttranchal Jal Vidyut Nigam Ltd., Dehradun

Prof. D. Das

81,000/-

Closed

16.

Checking of Design and Drawing of Electromechanical Equipment of Asi ganga - II-SHP

No. WRC-1014/2003-2004 dt. 17.3.2004

G.M. (SHP) Uttranchal Jal Vidyut Nigam Ltd., Dehradun

Prof. D. Das

1,48,770/-

Work in progress

17.

Checking of Design and Drawing of Electromechanical Equipment of Asi ganga - I-SHP

No. WRC-1015/2003-2004 dt. 18.3.2004

G.M. (SHP) Uttranchal Jal Vidyut Nigam Ltd., Dehradun

Prof. D. Das

1,64,160/-

Work in progress

2004 - 2005

1.

Preparation of PER for Gauri-Chhina SHP

No. WRC-1001/2004-2005 dt. 19.4.2004

UJVN Ltd.,  Dhhradun

Prof. D. Das

1,89,000/-

Closed

2.

Design and Drawing for Protection Work Down Stream at Baba Power House, WRC-1002/2004-2005 dt. 27.4.2004

UPJVN Ltd., Saharanpur

Prof. U.C. Chaube

64,800/-

Closed

3.

Preparation of DPR for Helgu SHP

No. WRC-1003/2004-2005 dt. 7.5.2004

E.E. Pala Maniri HE, UJVN Manali

Prof. D. Das

4,10,400/-

Closed

4.

Preparation of DPR for Savarigad SHP

No. WRC-1004/2004-2005 dt. 7.5.2004

E.E. Pala Maniri HE, UJVN Manali

Prof. D. Das

4,10,400/-

Closed

5.

Preparation of DPR for Limchigad, SHP

No. WRC-1005/2004-2005 dt. 7.5.2004

E.E. Pala Maniri HE, UJVN Manali

Prof. D. Das

4,10,400/-

Closed

6.

Feasibility Study for Extension of Runway at Kullu Airport

No. WRC-1006/2004-2005 dt. 11.5.2004

Asstt. General Manager Engg. (c) Airport Authority of India, N. Delhi

Prof. Nayan Sharma

9,75,240/-

Work in progress

7.

Site Visit of Small Hydro Scheme Near Dharchula Pithoragarh, No. WRC-1007/2004-2005 dt. 13.5.2004

E.E.  UJVN Dehradun

Prof. Nayan Sharma

8,000/-

Closed

8.

Design of Bridges over Agra Canal

No. WRC-1008/2004-2005 dt. 19.5.2004

Project Manager, UP Project Corporation Ltd., Agra

Prof. Ram Pal Singh

1,62,000/-

Work in progress

9.

Design of Palwal & Lilwari Ghat VRBs

No. WRC-1009/2004-2005

Project Manager UP Project Corp. Ltd., Okhla

Prof. Ram Pal Singh

1,50,000/-

Work in progress

10.

PFR for Dunao SHP in Distt. Pauri

No. WRC-1010/2004-2005 dt. 18.6.2004

GM UJVN Ltd., Dehradun

Prof. D. Das

1,89,000/-

Closed

11.

DPR for Asiganaga III SHP

No. WRC-1011/204-2005 dt. 18.6.2004

GM UJVN Ltd., Dehradun

Prof. D. Das

3,78,000/-

Work in progress

12.

DPR for Kaligad SHP in Distt. Uttarkashi

No. WRC-1012/2004-2005 dt. 18.6.2004

GM UJVN Ltd., Dehradun

Prof. D. Das

3,78,000/-

Closed

13.

DPR for Bhilangana – II SHP in Distt. Uttarkashi

No. WRC-1013/2004-2005 dt. 18.6.2004

GM UJVN Ltd., Dehradun

Prof. D. Das

3,78,000/-

Closed

14.

Design of Bela and Bansa Bridges over Agra Canal

No. WRC-1015/2004-2005 dt. 7.11.2004

Project Manager, UP Project Corporation Ltd., Agra

Prof. Ram Pal Singh

1,65,300/-

Work in progress

15.

Review of DPR for Proposed 15 MW Vanala HEP

No. WRC-1016/2004-2005 dt. 24.11.2004

M/S Him Urja Pvt. Ltd., New Delhi

Prof. D. Das

93,670/-

Closed

16.

Feasibility studies for laying pipe line along Alsaid Khand for Disposal of Silt Study BSL Project

No. WRC-1017/2004-2005 dt. 25.11.2004

CPCB, New Delhi

Prof. Gopal Chauhan

55,000/-

Work in progress

17.

Preparation DPR for Kaliganga – I SHP

No. WRC-1018/2004-2005 dt. 29.11.2004

GM UJVN Ltd., Dehradun

Prof. D. Das

3,78,000/-

Closed

18.

Preparation DPR for Kaliganga – II SHP

No. WRC-1019/2004-2005 dt. 29.11.2004

GM UJVN Ltd., Dehradun

Prof. D. Das

3,78,000/-

Closed

19.

Preparation DPR for Madhyamaheshwar SHP

No. WRC-1020/2004-2005 dt. 29.11.2004

GM UJVN Ltd., Dehradun

Prof. D. Das

3,78,000/-

Closed

20

Preparation of DPR for Tankul SHP

No. WRC-1021/2004-2005 dt. 29.11.2004

GM UJVN Ltd. Dehradun

Prof. D. Das

3,78,000/-

Work in progress

21.

Preparation of DPR for Painagad  SHP

No. WRC-1022/2004-2005 dt. 29.11.2004

GM UJVN Ltd. Dehradun

Prof. D. Das

3,78,000/-

Work in progress

22.

Site Visit to Okhla Barrage for Bearing

WRC-1023/2004-2005 dt. 1.12.2004

UP Irrigation Okhla

Prof. Gopal Chauhan

10,000/-

Work in progress

23.

Design of  Parallel Deoband Feeder Canal Section in Felling

No. WRC-1024/2004-2005 dt. 13.12.2004

Project Manager, UP Irrigation Corporation Ltd., Roorkee

Prof. Ram Pal Singh

66,120/-

Closed

24

Preparation of DPR for Urgam-II SHP

No. WRC-1025/2004-2005 dt. 17.12.2004

GM UJVN Ltd., Dehradun

Prof. D. Das

3,50,000/-

Work in progress

25.

Study on Sustainable Development of Flora Faina Ecology and Needs at Local Community due to Diversion at Satluj River for NJHEP

No. WRC-1026/2004-2005 dt. 25.1.2005

Satluj Jal Vidyut Nigam Ltd. Khakri Shimla

Prof. U.C. Chaube

7,16,300/-

Work in progress

26.

Physical Model Testing of Desilting Arrrangement for Jaldhaka Hydel Project

No. 2001/2004-2005 dt. 23.4.2004

Chief Engineer, Hydel WBSEB, Silguri

Prof. D. Das

14,99,040/-

Closed

2005 - 2006

1.

Restoration of Jalmahul Monumut in the Man Sagar Lake Jaipur

No. WRC-1001/2005-2006 dt. 19.4.2005

Jal Mahal Resorts Pvt. Mumbai

Prof. U.C. Chaube

1,26,000/-

Closed

2.

Numerical Modelling & Field Data Collection for Sarda Canal

No. WRC-1002/2005-2006 dt. 8.8.2005

Tahal Consulting Engineers, Gomti Nagar, Lucknow

Prof. Nayan Sharma

9,58,740/-

Closed

3.

Physical  Modelling & Lab Testing for Haidergarh Branch

No. WRC-2001/2005-2006 dt. 8.8.2005

Tahal Consulting Engineers, Gomti Nagar, Lucknow

Prof. Nayan Sharma

17,57,800/-

Work in Progress

4.

Preparation of Tender Specification for SHP

No. WRC-1003/2005-2006 dt. 2.9.2005

D.G.M. Pala Manori Project UJVNH Manasi, Uttarkashi

Prof. D. Das

55,100/-

Closed

5.

Preparation of DPR for Dunao SHP

No. WRC-1005/2005-2006 dt. 12.9.2005

GM (SHP), UJV Ltd. Lucknow

Prof. D. Das

3,85,700/-

Work in Progress

6.

Techno Economic Appraisal at Patikari (16 MW) HEP

No. WRC-1006/2005-2006 dt. 9.10.2005

M/S Patikar Power n Private Ltd. Jorbagh, New Delhi

Prof. D. Das

1,65,300/-

Work in progress

7.

Evaluation Study of Rural Infrastructure (Irrigation) Project in Sagar Distt. of MP

WRC-1007/2005-2006 dt. 14.11.2005

NABARD Mumbai

Prof. U.C. Chaube

4,68,350/-

Work in Progress

8.

Planninjg & Design of Rainwater Harvesting System at ITC Saharanpur

No. WRC-1008/2005-2006 dt. 21.11.2005

ITC Saharanpur

Dr. Deepak Khare

1,40,000/-

Closed

9.

Geological Investigations & Topographical Survey for Alingment of Tunnel for Asiganga I & II SHPS

No. WRC-1009/2005-2006 dt. 24.11.2005

Uttranchal JVH Maneri Uttarkashi

Prof. D. Das

1,65,300/-

Work in Progress

10.

Structural Design of Bunds in Sector 24 at Panchkula

No. WRC-1010/2005-2006

EEHUDA Panchkula

Prof. Ram Pal Singh

1,32,240/-

Work in Progress

11.

Structural Design of Bunds along River Ghaggar in Sector22, Panchkula

No. WRC-1011/2005-2006 dt. 7.12.2005

EEHUDA Panchkula

Prof. Ram Pal Singh

88,160/-

Work in Progress

12.

Construction of Design of Flarible Joint for Dharasu Power House of Manari Bhali Stage II HEP

No. WRC-1012/2005-2006 dt. 6.1.2006

Ex. Eng., Maneri Bhali Stage Const. Div., Chinyali Sotle, Uttarkashi

Prof. Gopal Chauhan

50,000/-

Work in Progress

2006 - 2007

1

Planning & Design of Rain water harvesting for Jalandhar City  No. WRC-1001/2006-2007dt. 7.4.2006

Jalandhar Municipal corp. Jalandhar

Dr. Deepak Khare

3,30,600/-

Closed

2

Techno Economic Appraisal of 100 MW Malana II HEP,

No. WRC-1002/2006-2007 dt. 20.4.2006

Everest Power Pvt Ltd. Gurgaon

Prof. D.Das

1,10,200/-

Closed

3

Hydrology study of Saran Ultra Mega Power Project,

 No. WRC-1003/2006-2007 dt. 5.5.2006

Desein  Pvt Ltd. Desein House Greater Kailash-II New Delhi

Prof. U.C. Chaube

7,81,190/-

Work in Progress

4.

Kullu Airport Runway Extension in Beas River

No. WRC-1004/2006-2007

Airport Authority of India

Prof. Nayan Sharma

8,13,122/-

Work in Progress

5

Reclamation of water logged Agricultural land through surface drainage system in development blocks, Khanpur Laksar, Bahadarabad, No. WRC-1005/2006-2007 dt. 2.9.2006

Assistant Director Watershed Management, Roorkee at Landhora

Dr. S.K. Mishra

17,119/-

Closed

6

Design of Cross regulator gates at km 79.372 of Agra canal 

No. WRC-1006/2006-2007 dt. 5.9.2006

STEP

Prof. Gopal Chauhan

25,000/-

Work in Progress

7

Ex Post evaluation on ODA Laon project WYC canal HEPs & Uniam HEP, No.WRC-1007/2006-2007 dt. 12.9.2006

Ernst & Young Shin Nihon, Japan

Prof. D. Das

1,50,000/-

Closed

8

Hydraulic Analysis & Construction Planning of Lodhoma Tunnel   No. WRC-1008/2006-2007 dt. 12.10.2006

Chief Engineer  Hydel Sevoke Road WESEB Siliguri ( West Bangal)

Prof. Nayan Sharma

5,38,752/-

Work in Progress

    9

Physical model studies of Lodhoma- Rammam Interconnection Tunnel,  No. WRC- 2001/2006-2007 dt. 12.10.2006

Chief Engineer  Hydel Sevoke Road WESEB Siliguri ( West Bangal)

Prof. Nayan  Sharma   

14,59.120/-

Work in Progress

10

Technical Due Diligence of 99 MW Chuzachen HEP

NO. WRC-1009/2006-2007 dt. 27.10.2006

KSK Energy Ventures Pvt. Ltd. Hyderabad

Prof. D.Das

1,12.240/-

Closed

11

Hydrological Studies for Sabarmati River front Development  Project,  No. WRC- 1010/2006-2007 dt. 23.11.2006

NIH,Roorkee

Dr. S.K. Mishra

44,896/-

Work in Progress

12

Hydrologyl and drainage study of Jharkhand Ultra Mega  Power Project, No. WRC-1011/2006-2007 dt. 19.12.2006

M/S/ Desein Pvt. Ltd. Desein House, G.K. II New Delhi

Prof. U.C. Chaube

14,59,120/-

Work in Progress

13

Design & Engineering for DUNAO SHP

No. WRC-1012/2006-2007 dt. 26.2.2007

Uttaranchal Jal Vidyut Nigam Ltd.,Deheradun

Prof. D.Das

11,12,400/-

Work in Progress

2007 - 2008

1

Progress review of Pati Kari (16 MW) hydroelectric Project

 No. WRC-1001/2007-2008 dt. 11.6.2007

Pati Kari Power Pvt. Ltd.

Prof. D.Das

1,34,832/-

Work in Progress

2

DPR for SHP at Borolia Irrigation Barrage

No. WRC-1003/2007-2008 dt. 3.7.2007

Bodoland Infrastructure Development company Pvt. Ltd.

Prof. D.Das

4,49,440/-

Work in Progress

3

Physical model studies of barrage for sawra kuddu HE Project No. WRC-2001/2007-2008 dt. 13.7.2007

Pabbar Valley Power Corp. ltd. Shimla

Prof. Nayan. Sharma

40,16,870/-

Work in Progress

4

Hydraulic Analysis of  Tai Race Tunnel of Baglihar hydroelectric Project, No. WRC 1004/2007-2008 dt. 22.8.2007

Jaiprakash Associate Ltd. New Delhi

Prof. Nayan Sharma

2,24,720/-

Work in Progress

5

Area Drainage and hydrological study of Talwandi sabo Thermal Power project ,No. WRC-1005/2007-2008 dt. 29.8.2007

M/S Desein Pvt. Ltd, Desein House G.K. II New Delhi

Prof. U.C. Chaube

10,11,240/-

Work in Progress

6

River Training of Ganga Near Nakhwa (1299 KM) Navigation Channel Development,No. WRC-1006/2007-2008 dt. 5.9.2007

Inland waterways Authority of India, Noida

Prof. Nayan Sharma

25,49,448/-

Work in Progress

7

River Training of Ganga Near Punarak (879 KM) for Navigation Channel Development, No. WRC-1007/2007-2008 dt. 5.9.2007

Inland waterways Authority of India, Noida

Prof.Nayan Sharma

25,49,448/-

Work in Progress

8

River Training of Ganga Near Digha (967 KM) Navigation Channel Development, No. WRC1008/2007-2008 dt. 5.9.2007

Inland waterways Authority of India, Noida

Prof. Nayan Sharma

25,49,448/-

Work in Progress

9

River Training of Ganga Near Arjunpur (1118 KM) Navigation Channel Development,  No. WRC-1009/2007-2008 dt. 5.9.2007

Inland waterways Authority of India, Noida

Prof. Nayan .Sharma

25,49,448/-

Work in Progress

10

River Training of Ganga Near Debchandpur (1247 KM) Navigation Channel Development, No. WRC-1010/2007-2008 dt. 5.9.2007

Inland waterways Authority of India, Noida

Prof. Nayan Sharma

25,49,448/-

Work in Progress

11

River Training of Ganga Near Bateshwarsthan (683 KM) Navigation Cannel Development,  No. WRC-1011/2007-2008 dt. 5.9.2007

Inland waterways Authority of India, Noida

Prof. Nayan Sharma

25,49,448/-

Work in Progress

12

Preparation of DPR for Drinking cum Power Generation project for Almora Town, No. WRC1012/2007-2008 Dt. 20.9.2007

Uttranchal InfracstuctureProject Cop.Pvt. Ltd. Deheradun

Prof. D.Das

22,47.200/-

Work in Progress